Physical & Infrastructure Control
Apply the same authority, execution, STOP, recovery and evidence pattern while preserving the exact software/SIL/simulator/hardware boundary.
Software control claims can easily outrun what has actually been tested in simulators, real hardware or operational environments.
Apply the same authority, execution, STOP, recovery and evidence pattern while preserving the exact software/SIL/simulator/hardware boundary.
- workload admission
- bounded actuation semantics
- STOP
- evidence
- claim-boundary preservation
MIXED — qualified SIL, real-GPU and simulator results with explicit ceilings
- 409,600-server / 15-kernel software/SIL point
- real two-GPU bounded result
- autonomy-simulator simulator qualification
- compute
- data-centre models
- CNI information systems
- autonomous systems
Compute, infrastructure-information and autonomy evidence with bounded physical-reality ceilings.